General Study For The Construction Of A Bridge In Douars Agoudim And Three Bridges In Arbane, And Study For The Creation Of Two Roads: Souk Road Connecting Tamayoust And Toukast Over A Length Of 2,600 Km, And The Road Connecting El Khoukh At And Sidi Brahim Leading To Douar Tabajit Over A Length Of 2,100 Km Common Ait Benyacoub (EXPIRED)