Sw-I: Vijayawada Division : Tsr(P) - 33.813Kms (Vijayawada - Visakhapatnam : Tsr(P) - 29.962Km & Vijayawada - Gudur : Tsr(P) - 3.851Km) With Trt Of Exg. 60Kg/90Uts Rails On Psc6 Sleepers 1660Nos/Km Density With New Wider Psc Sleepers 1660 Nos./Km Including Recoupment And Increasing Of Ballast Cushion To 35 Cm And Deep Screening Of Ballast. Sw-Ii: Vijayawada Division : I). Vijayawada-Visakhapatnam Section (Up&Dn): :- Tbr - Total Length Is 40.007 Km, (I) Tbr: Through Ballast Recouping Of Track Along With Deep Screening By Bcm For Total Length Of 31.172 Tkm (Ii) Tbr(Loop Lines) : Through Ballast Recouping Of Track Along With Manual Deep Screening For Total Length Of 8.835 Tkm Between Pulla - Gunadala Stations Of Den/Central/Bza Jurisdiction. Sw-Iii: Vijayawada Division : Gudur - Vijayawada-Visakhapatnam Section (Up&Dn): :- (I) Tfr(A/F) : Through Fittings Renewal On Psc Sleeper Track For A Length Of 5.231 Km (Ii) Tfr (Grsp Only ) : Through Fitting Renewal Grsp Only On Psc Sleeper Track For Alength Of 52.008 Km (Iii) Glued Joints-7 Nos & (Vi) Ttr(Fs+Tws+Wcmsc)-6 Sets, Ttr(Ds)-2 Sets ,Ttr (Wcmsc )-22 Sets , Ttr (Tws + Wcmsc ) - 6 Sets ,Ttr(Cs+Cmsc)= 6 Sets At Various Locations In Den/Central/Bza Jurisdiction.