Due To The Rugged Orography Of The Municipality Of Palau-Saverdera, Specifically In The Center Of The Town And The Urb. Of Bellavista And Urpasa, The Distribution Network Operates At Pressures Much Higher Than The Minimum Pressures Required By The Service. Consequently, All Network Incidences And Even User Consumption Itself Are Unnecessarily High. Additionally, The Pipes In The Area Suffer A Greater Number Of Breakdowns Due To The Accelerated Aging Resulting From The High Pressures. It Is Intended To Carry Out The Installation Of Pilotages In Already Existing Reducers In The Following Sectors: Urb. Mas Bohera And Urban Core.