Supply, Assembly, Provision And Dismantling Of Approximately 4,800M² Of Facade Scaffolding. The Duration Of Provision Is Generally 61 Calendar Weeks. Technical Requirements: Load Class 4 (>= 300Kg/M²); Width Class W09 (>= 0.90M) The Duration Of The Work Is 40 Working Days, To Begin In The Second Half Of 2026. The Work Is Awarded At Unit Prices.