Race 3 25 L-Integrated Contract For Executive Design, Including The Safety Coordination During The Design Phase, And The Construction Of 4 Photovoltaic Systems Connected To The E-Distribution Electricity Network. Use Of The Energy Produced In Direct Self -Consumption And Distance Self -Consumption. Overall Power 471.33 Kwp