WORKS TO UPGRADE THE OLD ELECTRICAL INSTALLATION INFRASTRUCTURE AT THE 11KV MAIN INPUT SUBSTATION, UNIVERSITY OF SCIENCES MALAYSIA, ENGINEERING CAMPUS, NIBONG TEBAL, PENANG.