Selection Of A Contractor For The Preparation Of A Complex Conformity Assessment Report With The Basic Requirements For The Construction And Technical Control Of The Part "Structural" And The Exercise Of Construction Supervision During The Construction Of The Site: "Strengthening And Restoration Of Republic Road Iii-602 (Op Kyustendil-Radomir)-Konyavo-Gorna Fucha