- Reinforcement By Means Of A Regularization Layer And Rolling With Hot Bituminous Mixture, 4.5 Cm Thick. It Is Projected To The Type Ac16 Surf B 50/70. - Performance On The Drainage, Cleaning Of Longitudinal Drainage Elements (1,077 M) And Transverse (27.50 M), Construction Of A Concrete Covered Gutter, American Type, Remoundable Ttr-10 (450 M). - Painted Road Brand On Both Margins Of The Road (4,300 M). - Stabilization Of Two Local Landslides Of The Platform On The Access Road To Asnurri.