A) Localized Flab Repair, With The Sanitation Of The Platform At A Thickness Of 50 Cm, On An Area Of ​​50 M2. B) Reinforcement Of The Firm By A Layer With Hot Bituminous Mixture Of The Type Ac16 Surf B 50/70, On A Surface Of 10,791 M2 And Thick 5.5 Cm. C) Improvement Of The Longitudinal Drainage By Execution Of Cuneta Covered With Ttr-10, Remoundable (Length 180 M) And, Cleaning Of Gutters (Length 2,650 M) And Transverse Passage Works (66 M).