1) Construction Of Rcc R...Oad (Ch. 0.00 To 190.00 M) From Sub Register Office To Sajal Shop Ward No. 04 Under Moheskhali Pourashava.2) Construction Of Brick Drain With Top Slab (Ch. 0.00 To 222.00 M) From Janata Bazar Road (Abdul Malek Shop) To Kuisshamar Para Jame Moshjid Culvert Ward No- 01 Under Moheskhali Pourashava.3) Construction Of Rcc Road (Ch. 0.00 To 480.00 M) From Sabbir Shop To Aman Ullah Shop Ward No. 03 Under Moheskhali Pourashava.4) Development Of Hbb Road (Ch. 0.00 To 92.00 M) From Moloi Hasem House To Abdul Hamid House Ward No. 05 Under Moheskhali Pourashava.5) Construction Of Rcc Drain Ch. 0.00 To 48.00 M) From Sirajul Islam House To Kari Abdul Kalam House At Ward No. 07 Under Moheskhali Pourashava.6) Construction Of Rcc Road (Ch. 0.00 To 535.00 M) At Mosarrof Ali Para (St: Tayzzo Pond) Ward No. 02 & 03 Under Moheskhali Pourashava.7) Construction Of Rcc Road (Ch. 0.00 To 125.00 M) From South Ghona Para To Mujib Kella Ward No. 05 Under Moheskhali Pourashava. More