The Object Of The Contract Is The Execution Of The Works For The Installation Of Two Elevators And A Electrogen Group, Broken Down Into Two Lots, In Accordance With The Provisions Of The Ppt And With Measures Of Sustainable Public Contracting, Broken Down Into Two Lots.