PROVISION FOR MISSION TO CONTROL THE DEVICES AND PRESSURE PIPES OF THE GABES LPG PLANT AND INSPECTION OF THE FIRE-FIGHTING SYSTEM AND CIRCUIT DURING THE 2025 TEN-YEAR SHUTDOWN IN TWO (02) LOTS