Renew The Distribution Network Of The Section That Feeds The Farmhouses Of Can Sort, Can Jaumet, Can Mató And Can Pere De L'Alzinar; Get The Supply Of The Whole Neighborhood From The Two Head Deposits, Can Cervera And The Forn De Dalt; At The Head, The Installation Of A Meter For The General Consumption Control, To Quickly Detect Leaks; Installation Of A Pressure Regulatory Valve At The Point Called `` Little Flour '' Where A Future Loading Deposit Defined In The Pda Will Be Located, To Reduce The Pressure Of The Downstream Network And Finally Also Projected The Installation Of A Column Hydrant, Thus Guaranteeing A Water Point For Firefighters In Case Of Fire.