35/2025/Ksz Removal, Dehydration, Loading, Transport And Neutralization Or Development Of The Residual Sediment With A Mineral Fraction (Sand) In The Designated Chambers Of The Bio-Blocked Sequence, Located In The Sewage Treatment Plant In Świnoujście